Japan
Nuclear Fuel Removal
In 2011, the Fukushima, Japan nuclear energy plant was hit by an earthquake and subsequent tsunami, causing immense damage to the reactors and the evacuation of hundreds of thousands of people. Today, after a five-year delay caused by high levels of radiation and heavy debris, Tokyo Electric Power Co (TEPCO) began removing 566 nuclear fuel rods from the open storage pools of Unit 3, which alone will take two years. Part of this four-decade plan to shut down the entire plant is the removal of molten nuclear fuel, which will not begin until 2021. Residents of towns evacuated near the plant, such as Okuma, are allowed to return to their homes now that radiation is at safer levels. This map depicts the location of the nuclear plant and the evacuation zone around Fukushima, Japan. Click on the map to learn more.
|